Infrastructure

Edison’s infrastructure is crumbling under Sam Joshi’s failed leadership. A major water main break in December 2024 left approximately 20,000 residents without water for several days. The incident highlighted the town’s aging infrastructure, with some pipes dating back 80 to 100 years. Compounding the issue, the Local Emergency Planning Committee was found to be severely understaffed, with only 3 of its 14 positions filled.

That’s why a key priority of my campaign is rebuilding Edison’s infrastructure the right way.

As Mayor, I will:

✔ Begin water and sewer replacement within the first 100 days.

✔ Create an independent Water/Sewer Utility to ensure accountability.

✔ Accelerate road improvements, prioritizing the worst roads first.

✔ Require private utility companies to repave entire roads after work.

✔ Appoint qualified experts to our emergency planning committee.

✔ Provide residents with open and transparent communication.

Sam Joshi’s neglect put our community at risk. I will fix Edison’s infrastructure and protect our residents.